Condensate Stabilizer De-bottlenecking

ProjectYetagun Field Development Project
OwnerPetronas Carigali (Hongkong) Myanmar Ltd.
ClientPetronas Carigali (Hongkong) Myanmar Ltd.

Scope of Work:

Process Engineering Study and De-bottlenecking of Condensate Stabilizer Column and propose suitable solutions to enhance the performance of units;

The scope of work also includes;

  • To perform performance trials at site
  • To perform simulations for the present operating conditions and identify the gap
  • To propose suitable solution to enhance the operating parameters of the Condensate Stabilizer Columns
  • To perform detailed engineering design and modifications to implement the possible solution

Address:
Petro6 Engineering & Construction Pvt. Ltd.
TVH Agnitio Park, 2nd Floor,
141 Rajiv Gandhi Salai (OMR)
Kandanchavadi, Chennai,
Chennai, Tamil Nadu - India 600 096.

Tel:
+91-44-4022-6368

Petro6 Engineering & Construction (Singapore) Pte Ltd
#06-31 Unity Centre,
51 Bukit Batok Crescent
Singapore-658 007

Petro6 Engineering & Construction (Myanmar) Pvt Ltd,
No-405, Building No.25
Yazana Business Center, Dhamazedi Road
Sanchaung Township, Yangon,
Myanmar

 

Email:
: info@petro6ec.com
: sales@petro6ec.com
: hr@petro6ec.com